Specifications
Station Unit Description Production Process 1H AE 40/80 Bar loading and sawing off 2H VE NC 26/80-H Drilling + chamfering 3H VE 36/100 pre-turning 4H VE 28/80IK Drilling (do not drill through) 5H CNC 50/100-3A Turning several outer contours 6H CNC 50/100-3A Recess turning 7H VE 26/80-H Drilling 7V VE 26/80 Drilling and deburring 8H WDE 30/60 Inverter 9H VE 26/80-H Brushing and deburring 10H VE NC 36/100-1A Drilling and axial grooving 11H VE NC 36/100-1A Ring recessing 12H VE NC 26/80-H Drilling + chamfering 13H CNC 50/100-3A Planing and front contour 14H VE NC 36/100-1A Chip removing and countersinking 15H VE NC 36/100-H 3-axes Window deburring 16H Unloading handlingNotes
Pfiffner Hydromat HB 32/45-16 , 2006
Coolant Tank With Large and Small Magnetic Chip Conveyor, Filtration System, Metal Walkway, Electrical Cabinet